Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the pods domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/testmbima/domains/test.mbima.org/public_html/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the jetpack domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/testmbima/domains/test.mbima.org/public_html/wp-includes/functions.php on line 6131
中國BIM運用經典案例 – MBIMA澳門建築資訊模型協會

中國BIM運用經典案例

  • 北京大兴国际机场 – 该项目使用BIM技术进行建设,包括机场综合体、航站楼、停车场、地铁接驳站等多个建筑。BIM技术在建设过程中起到了重要作用,从而使项目能够按时完成。
  • 上海中心大厦 – 这座超高层建筑使用BIM技术进行设计和建造。BIM技术可以在建造过程中协调各个工程的进度,从而提高建造效率和质量。
  • 深圳湾超级总部基地 – 该项目是一个大型商业综合体,包括多个建筑和公共空间。BIM技术在整个项目的设计、建造和运营中发挥了重要作用。
  • 北京奥林匹克公园 – 该项目是2008年北京奥运会的主要场馆之一。BIM技术在设计和建造过程中协调了多个设计团队之间的工作,从而使项目能够按时完成。
  • 深圳北站 – 这个大型交通枢纽使用BIM技术进行设计和建造,从而使得建造过程更加高效和准确。
  • 南京南站 – 这个大型交通枢纽利用BIM技术进行建造,从而使得建造过程更加高效和准确。
  • 北京城市副中心地块 – 这个城市副中心地块包括多个建筑和公共空间,使用BIM技术进行设计和建造。
  • 上海国际航运中心 – 这个大型商业综合体利用BIM技术进行设计和建造,从而使得建造过程更加高效和准确。

中國BIM運用經典案例包括多个大型建筑和基础设施项目,例如北京大兴国际机场、上海中心大厦、深圳湾超级总部基地、北京奥林匹克公园、深圳北站、南京南站、北京城市副中心地块和上海国际航运中心。这些项目利用BIM技术进行设计、建造和运营,提高了建造效率和质量,并减少了错误和成本。


已发布

分类

,

作者:

评论

发表回复

您的邮箱地址不会被公开。 必填项已用 * 标注